Client Update Agent
A clear weekly status note from whatever notes you already scribbled in the meeting.
Every Friday, you paste in whatever internal notes exist for a project — meeting minutes, a few bullet points on progress, an email thread excerpt — and this agent turns it into a clean, client-ready status update: what happened this week, what's coming next week, and a clearly separated section for anything that actually needs the client's decision or input. It's built for firms running several active projects at once, where writing a thoughtful individual update to every client every week is the first thing that gets skipped when things get busy. The draft still goes through you before it's sent — this agent removes the blank-page problem, not the judgment call of what a client needs to hear.
What this agent takes off your plate
- Every active project gets a consistent weekly update instead of updates only when something goes wrong
- Clients get one clear "needs your decision" section instead of decisions buried in narrative paragraphs
- Project managers go from a blank page to a 5-minute review and edit per project
- A written weekly record of project status that's useful if a scope or timeline question comes up later
- Fewer client check-in calls interrupting design time, because the update already answered "where are we"
The stack
Real costs & ROI
- Claude Pro or ChatGPT Plus$20/mocovers weekly updates across a typical small firm's full active project load
- Your existing project notes/meeting minutes tool$0/moworks with whatever you already use — a shared doc, a PM tool, or plain email notes
- Zapier Starter (or Make free tier)$0–30/moonly needed for the scheduled Friday run in Step 5; skip it and paste into a chat window if you have one or two active projects
The math
A thoughtful individual client update takes most project managers 20–40 minutes to write from scratch when they're starting from raw meeting notes — across even 4–5 active projects, that's 2–3 hours a week of writing time that competes directly with billable design and coordination work. This agent cuts that to roughly 5–10 minutes of review and light editing per project, saving 1.5–2.5 hours a week for a PM at a $60–100/hour effective cost, worth $90–250/week — against a flat $20/month tool cost. The harder-to-quantify payoff is fewer surprised or anxious clients calling to ask "where are we," since a consistent weekly update answers that question before it's asked, which is one of the most common sources of friction on long design and construction timelines.
Build steps
Write your update format and voice guide
Decide once what a good weekly update looks like for your firm, so every project's update is consistent instead of reinvented each week.
Data you need
Pull 2–3 past client updates you were proud of, or just decide on the format from scratch if you don't have past examples.
I'm a project manager at [FIRM NAME], a [FIRM SIZE]-person architecture firm. I want to build a weekly client update format and voice guide so an AI can turn my raw meeting notes into a consistent, client-ready update. Past updates I've written that I liked (paste 1–3, or describe the format I usually use): [PASTE OR DESCRIBE] My firm's voice: [e.g. warm-professional, direct and concise, detail-oriented] Please build me: 1. **A standard update structure** — sections for "this week," "coming up next week," and a clearly separated "needs your input" section 2. **A voice guide** — 3–5 tone words with a short example paragraph 3. **A "needs your input" formatting rule** — how decisions or open questions should be phrased so they're impossible for a client to skim past (e.g. bolded, numbered, with a clear ask and, if relevant, a deadline) 4. **A length rule** — how long a typical weekly update should be so it gets read, not skimmed and ignored 5. **A "quiet week" template** — for weeks where genuinely little happened, so the update doesn't feel padded or, worse, get skipped entirely Save this as my client-update voice guide — every future weekly-update prompt will reference it.
Set up a project reference sheet per active project
A short standing reference per project keeps updates consistent even when different team members write the notes each week.
Data you need
For each active project, note: client name(s) and preferred tone, current phase, overall timeline, and any standing context the agent should know (a sensitive topic, a client who prefers very short updates, a known upcoming decision point).
Agent Pack
Unlock the Architecture Firm Agent Pack.
One payment unlocks all 3 blueprints in this pack — build steps, the complete system prompt, guardrails, a test checklist, and the maintenance routine — for $29.
one-time, unlocks all 3 blueprints in this pack on this browser. Secure checkout via Stripe.
More in this pack
More for Architecture Firm
Proposal Draft Agent
A structured first draft from a project brief and your own past proposals — never sent without a principal's eyes on it.
Code & Zoning Research Agent
A first-pass research digest with a citation for every claim — never a substitute for the licensed architect's own verification.